Exchequer Court, London

BMS Upgrade at Exchequer Court, London

CLIENT
Savills
SITE
Exchequer Court, London
PROJECT
Advanced BMS Upgrade

Advanced BMS upgrade delivers futureproofed environmental control at Exchequer Court

Exchequer Court is a multi-let office building, at the heart of London’s business district.

The complex sits opposite The Gherkin and is set out over six storeys, offering 110,000 sq ft of office accommodation. Tenants include Bank of Bangkok, Pinebridge Investments Europe, Argo Managing Agency, Pret A Manger and Itsu.

Submit your details below in order to download the case study pdf

    Savills, the building management company for Exchequer Court, asked BGES Group to replace the building’s existing AX controllers with state-of-the-art Tridium N4 Jaces and IO. A preventative upgrade, the aim was to futureproof the BMS, reduce the maintenance burden and improve environmental conditions for occupants.

    BGES Group supplied, installed and migrated the software from AX to N4 and upgraded all the graphics to match the new Savills standard. We also implemented tagging and hierarchies on the points structure so the system could be easily searched and filtered. The project also included the installation of a full fibre optic and Cat6 infrastructure and hardware to support the new building management system, including remote access via a firewall supplied by BGES.

    Exchequer Court is a busy office building, so it was important to keep the building’s existing services operational while we worked. Most of our work was carried out behind the scenes, and when we needed to enter tenant areas, we undertook the work out of hours or at weekends.

    Savills chose to work with BGES on this project due to our proven track record of delivering high-end work on their behalf.

    Following the upgrade to state-of-the-art building controls, the building delivers enhanced comfort to occupants and improved environmental control. Importantly, the system is fit for the future, greatly reducing the risk of faults and downtime, which will yield maintenance savings over time.

    On completion of the project at Exchequer Court BGES has been awarded the ongoing service contract for the site.

    “We wanted to gain more precise control of the building management system at Exchequer Court, with the goal of improving occupant comfort conditions and streamlining the maintenance process. Thanks to BGES Group we now have a state-of-the-art control system, which is much more user-friendly and can be accessed remotely. Simon and his team are highly knowledgeable and a pleasure to work with. They also went out of their way to ensure minimal disruption to tenants during the installation process.”

    Paul Sear
    Building Manager, Savills

    More info

    For more information about this or any project listed on our website, please Contact the BGES Group

    Telephone: 0333 015 9995

    BG House, Campbell Way
    Dinnington, Sheffield
    South Yorkshire
    S25 3QD